首页> 外文期刊>MATEC Web of Conferences >Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS) Construction Projects
【24h】

Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS) Construction Projects

机译:迈向综合团队实践:以马来西亚工业建筑系统(IBS)建设项目为例

获取原文
           

摘要

Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS) projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.
机译:与传统施工过程中的分散性相关的问题,例如专业人员隔离,设计与施工之间缺乏协调以及其过程的顺序方式等,已影响到施工性能,导致缺乏集成,浪费,生产率低下和效率。综合团队实践被认为是最重要的。不幸的是,对于完全集成化团队的研究重点有限,特别是对于马来西亚工业建筑系统(IBS)项目。因此,本研究论文从传统方法中探索并确定了完全整合团队的规模,并进行了验证流程以在马来西亚IBS项目中实施。提出的研究使用访谈案例研究来获取定性数据。人们发现,传统建筑过程中完全整合的团队的规模可以适用于马来西亚的IBS项目。将提出有关在IBS设计和施工过程中如何整合团队以最小化碎片缺口的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号