...
首页> 外文期刊>E3S Web of Conferences >Estimating the effect of equipment reliability indices, schedules, and regular overhaul scopes on reliability and efficiency of combined heat and power plants
【24h】

Estimating the effect of equipment reliability indices, schedules, and regular overhaul scopes on reliability and efficiency of combined heat and power plants

机译:估算设备可靠性指标,时间表和定期检修范围对热电联产电厂的可靠性和效率的影响

获取原文
           

摘要

We have developed a technique and a programming-computing suite (PCS) to estimate the effect of equipment reliability indices, schedules, and regular overhaul scopes on reliability and efficiency of combined heat and power plants (CHPPs). We describe the approach to predict heat and electric loads for the investigated CHPP operation period, taking into account the features of the power cogeneration. We performed optimization studies of two operation periods (different in overhaul resources) for an industrial-heating CHPP.
机译:我们已经开发出一种技术和编程计算套件(PCS)来估算设备可靠性指标,进度表和定期检修范围对热电厂联产(CHPP)的可靠性和效率的影响。考虑到热电联产的特征,我们描述了预测CHPP运行期间的热负荷和电负荷的方法。我们对工业加热CHPP的两个运行周期(大修资源不同)进行了优化研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号