...
首页> 外文期刊>EPJ Web of Conferences >Nuclotron Beam Momentum Estimation Using Multiwire Proportional Chambers and Drift Chambers in the BM@N Experiment
【24h】

Nuclotron Beam Momentum Estimation Using Multiwire Proportional Chambers and Drift Chambers in the BM@N Experiment

机译:在BM @ N实验中使用多线比例腔和漂移腔进行Nuclotron束动量估计

获取原文
           

摘要

The BM@N experiment is considered as the first phase of NICA Mega science project. The energy of the beam will vary from 1 to 6 GeV/u. The beams delivered by Nuclotron will be of different types from protons to Au. The ability to reconstruct the beam momentum with high precision is one way for showing that the tracking detectors are tuned in the right way and the reconstruction procedure performs well. A quick overview of the experimental setup is given in the work along with the description of some of the main tracking detectors. The beam momentum reconstruction procedure is described and results are presented for different values of the beam energy.
机译:BM @ N实验被视为NICA Mega科学计划的第一阶段。光束的能量将在1到6 GeV / u之间变化。 Nuclotron传递的光束从质子到金都会有不同的类型。高精度重建光束动量的能力是表明跟踪检测器以正确的方式调谐并且重建过程执行良好的一种方式。在工作中简要介绍了实验装置,并介绍了一些主要的跟踪探测器。描述了束动量重建过程,并给出了不同束能量值的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号