Earned Value based Liability Calculation Algorithm for Schedule Delays in Construction Projects

机译:工程项目进度延误的基于挣值的责任计算算法

获取原文
           

摘要

Objectives: It has been observed that delays and disputes are becoming a common occurrence in Indian construction projects. The aim is to determine amongst all participants who is more responsible for delay which has affected actual progress of project during its executing phase and resulted in escalation of associated costs. Furthermore proposed work can also be used to identify the cost associated with each delay. Methods/Statistical Analysis: ICBF method forms the basis for proposed improvements to obtain more refined results to determine delay responsible party. A series of mathematical equations are synthesized for cost overrun and project performance due to ingress of delays and delay liabilities due to owner, contractor and third party respectively. Findings: It was observed that in a construction activity, a number of participants are involved. The algorithm developed, primarily provides its user with the actual amount of delay and distributes it among client, contractor and third party. Secondly it also provides cost of each delay. Application/ Improvements: The proposed research will help in resolving delay dispute claims by tabulating cost and it effect on scheduled performance. Therefore arbitrator will be able to identify which participant is more responsible for delay; hence a fair decision can be reached. An overview of cost impacts due to time overrun can be examined.
机译:目标:据观察,在印度的建设项目中,延误和纠纷已成为一种普遍现象。目的是在所有参与者中确定对延误负责的所有参与者,这些延误影响了项目在执行阶段的实际进度并导致相关成本的上升。此外,建议的工作还可以用于识别与每个延迟相关的成本。方法/统计分析:ICBF方法构成了提出的改进的基础,以获得更完善的结果来确定延迟责任方。针对因延迟而造成的费用超支和项目绩效以及由所有者,承包商和第三方分别引起的延迟负债综合了一系列数学方程式。调查结果:据观察,在一项建筑活动中,涉及到许多参与者。开发的算法主要为用户提供实际的延迟量,并将其分配给客户,承包商和第三方。其次,它还提供了每个延迟的成本。应用/改进:拟议的研究将通过列出成本及其对计划绩效的影响,来帮助解决延误争议索赔。因此,仲裁员将能够确定哪个参与者对延迟负有更大责任;因此可以做出公正的决定。可以检查由于时间超支造成的成本影响概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号