首页> 外文期刊>Journal of Water Resource and Protection >Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period
【24h】

Study on Factors Influencing the Reliability of the Organization Management Chain of the Large and Medium-Sized Project in the Construction Period

机译:施工期大中型项目组织管理链可靠性影响因素研究

获取原文
           

摘要

On the basis of analyzing the reliability of the organization’ management chain of the large and medium- sized project in the construction period, the paper studies the factors influencing the reliability of the organi-zation management chain, which, corresponding to four elements of management chain – “Management Loop”, “Management Link”, “Management Chain”, and “Management Network”, can be summarized as project main body, interface management, connection sequence and management model. The paper then re-searches on the specific influencing factors from the above-mentioned four aspects.
机译:在分析建设期大中型项目组织管理链可靠性的基础上,研究了影响组织管理链可靠性的因素,对应于管理的四个要素链–“管理循环”,“管理链接”,“管理链”和“管理网络”可以概括为项目主体,界面管理,连接顺序和管理模型。然后从上述四个方面对具体的影响因素进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号