首页> 外文期刊>Journal of Maps >Use of isochrone maps to assess the impact of high-speed rail network development on journey times: a case study of Nanjing city, Jiangsu province, China
【24h】

Use of isochrone maps to assess the impact of high-speed rail network development on journey times: a case study of Nanjing city, Jiangsu province, China

机译:利用等时线图评估高铁网络发展对出行时间的影响:以中国江苏省南京市为例

获取原文
           

摘要

It is well known that the increasing development of transport infrastructure will result in temporal and spatial convergence. As an important component of China’s high-speed rail (HSR) network, an ambitious HSR building program in Jiangsu province will extend the network to cover all cities and 95% of counties by 2030. This study aims to present and analyze the impacts of the evolving HSR network in Jiangsu province over the period of 2010–2030 by developing multi-phased isochrone maps of Nanjing city (the provincial capital of Jiangsu province). During the process, layered cost distance, a new method based on a door-to-door approach in actual travel time calculations, is proposed in order to draw the maps at a more detailed geographical level. Our results are expected to facilitate proactive public policy decisions related to improving the transport network.
机译:众所周知,运输基础设施的不断发展将导致时间和空间融合。作为中国高铁(HSR)网络的重要组成部分,一项雄心勃勃的江苏省高铁建设计划将在2030年前将该网络扩展到覆盖所有城市和95%的县。通过开发南京市(江苏省省会城市)的多阶段等时线图,在2010-2030年期间在江苏省发展高铁网络。在此过程中,提出了分层成本距离(一种在实际旅行时间计算中基于门对门方法的新方法),以便在更详细的地理级别上绘制地图。我们的结果有望促进与改善交通网络有关的主动公共政策决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号