首页> 外文期刊>Journal of Finance and Economics >Macro-Economic Risk Factors on Perfomance of Public Private Partnership Renewable Energy Projects: Evidence from Geothermal Renewable Energy Projects in Kenya
【24h】

Macro-Economic Risk Factors on Perfomance of Public Private Partnership Renewable Energy Projects: Evidence from Geothermal Renewable Energy Projects in Kenya

机译:公私合营可再生能源项目绩效的宏观经济风险因素:肯尼亚地热可再生能源项目的证据

获取原文
           

摘要

Increasing demand for infrastructure has caused a rise in the global adoption of public private partnerships concept. However, over the years most developing countries have failed to attract more private investments as realized in developed counties this has largely been blamed on macroeconomic conditions. The purpose of this study was therefore to establish how macroeconomic risk influence the performance of public private partnership renewable energy projects in Kenya. The study adopted a pragmatic paradigm and employed a mixed methods approach, correlational and descriptive survey design.. Quantitative data was collected by use of a self-administered questionnaire and while an interview guide was used to collect qualitative data after piloting and reliability established. A sample size of 263 respondents was drawn from a target population of 769 using the Yamane formula. For descriptive statistics the study used the mean and standard deviation. For inferential statistics the study used Pearson’s Product Moment Correlation (r) and Multiple Regression while the F-tests were used in hypothesis testing. The study established a significant influence of macroeconomic risks was significantly related to performance of public private partnerships renewable energy projects with F (1,205) = 117.416, p< 0.001, R2=0.364, H0 was consequently rejected. Based on this finding the study recommends macroeconomic stability to promote public private partnerships.
机译:对基础设施的需求不断增加,导致在全球范围内采用公私合作伙伴关系的概念有所增加。然而,多年来,大多数发展中国家未能吸引更多的私人投资,这在发达国家已经意识到,这主要归咎于宏观经济状况。因此,本研究的目的是确定宏观经济风险如何影响肯尼亚公私合作可再生能源项目的绩效。该研究采用务实的范式,采用了混合方法,相关性和描述性调查设计。通过使用自行管理的问卷收集定量数据,并在建立了试验和可靠性之后使用访谈指南收集定性数据。使用Yamane公式,从769个目标人群中抽取了263名受访者作为样本。对于描述性统计,该研究使用了均值和标准差。为了进行推论统计,该研究使用了Pearson的乘积矩相关性(r)和多元回归,而F检验用于假设检验。该研究确定了宏观经济风险的显着影响与F(1,205)= 117.416,p <0.001,R2 = 0.364,H0被拒绝的公私合作可再生能源项目的绩效显着相关。基于这一发现,研究建议宏观经济稳定以促进公私伙伴关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号