首页> 外文期刊>Journal of Earth Sciences and Geotechnical Engineering >Mystery of Mosul Dam the Most Dangerous Dam in the World: Experts Proposals and Ideas on Mosul Dam
【24h】

Mystery of Mosul Dam the Most Dangerous Dam in the World: Experts Proposals and Ideas on Mosul Dam

机译:摩苏尔水坝之谜世界上最危险的水坝:摩苏尔水坝的专家建议和想法

获取原文
           

摘要

During and after the construction of Mosul Dam, in Iraq, all the studies expressed a clear concern on the fact that the region of the dam suffers from extensive presence of soluble rock formations that might undermine the safety of the dam with its large reservoir. Most of the studies dealt with foundation treatment and safety hazards due to the dissolution of gypsum and anhydrite. To overcome the problem, grouting operations were performed. The seepage of water continued and this highlighted the possibility of the dam failure. Different grouting techniques and methods were suggested but the results were the same. Finally, it was decided to limit the maximum operation water level to EL. 319 m (a.s.l.) instead of EL.330 m (a.s.l.). This recommendation has remained in force up to now with the loss of sizable storage of irrigation water and power potential.
机译:在伊拉克的摩苏尔大坝建造期间和之后,所有研究都对大坝地区遭受大量可溶性岩石形成这一事实表示关注,这可能损害大坝水库的安全性。由于石膏和硬石膏的溶解,大多数研究涉及地基处理和安全隐患。为了克服该问题,进行了灌浆操作。水的渗漏仍在继续,这突出了大坝倒塌的可能性。提出了不同的灌浆技术和方法,但结果相同。最后,决定将最大运行水位限制为EL。 319 m(a.s.l.)代替EL.330 m(a.s.l.)。到目前为止,由于大量灌溉水和电力潜力的丧失,该建议一直有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号