...
首页> 外文期刊>Journal of Civil & Environmental Engineering >Climate Smart Technological Solutions in Egypt: Hydropower Plant of the New Assiut Barrage Case Study
【24h】

Climate Smart Technological Solutions in Egypt: Hydropower Plant of the New Assiut Barrage Case Study

机译:埃及的气候智能技术解决方案:新Assiut弹幕水电站案例研究

获取原文
           

摘要

In Egypt, Hydropower sector plays a key role in Climate smart technological solutions to mitigate and adapt climate change. Egypt intends to replace the existing Assiut barrage in Nile River with a new one incorporating a hydropower plant. The technical and economical feasibility of the rehabilitation of the existing barrage including the installation of a low head hydropower plant of about 32 MW is proved. The electricity production of about 250 GWh annually is planed. The optimization of hydropower output will be achieved through mitigation of project-related environmental and social impacts. The implementation of measures to predict, monitor and mitigate or avoid construction and operation impacts is planned. This Paper sets out information relating to the contribution of Hydropower plant of New Assiut Barrage Project towards Adaptation and sustainability options. The Paper assesses the socio-economic and environmental impact of the project, the indicators applicable to the scheme / community in question, and details of the method used to diagnose and monitor social-environmental performance. Where applicable, the diagnostic for the community must be presented separately from that carried out for the scheme. The Paper concludes that the Hydropower plant of the New Assiut Barrage Project has very promising positive aspects in relation to climate change mitigation and adaptation and sustainable development in Egypt.
机译:在埃及,水电部门在缓解和适应气候变化的气候智能技术解决方案中发挥着关键作用。埃及打算用一个新的装有水力发电厂的尼罗河取代现有的尼罗河Assiut堰塞。事实证明,修复现有拦河坝的技术和经济可行性包括安装约32兆瓦的低水头水力发电厂。计划每年发电约250 GWh。水电输出的优化将通过减轻与项目相关的环境和社会影响来实现。计划实施措施以预测,监控和减轻或避免对施工和运营的影响。本文列出了有关新阿西乌特拦河坝项目水电厂对适应和可持续性发展的贡献的信息。该文件评估了该项目对社会经济和环境的影响,适用于所涉方案/社区的指标以及用于诊断和监测社会环境绩效的方法的细节。在适用的情况下,针对社区的诊断必须与针对该计划进行的诊断分开显示。本文的结论是,新Assiut拦河坝项目的水力发电厂在埃及减缓和适应气候变化以及可持续发展方面具有非常有希望的积极方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号