Today, in Serbia there are several sites with installed combined heat and power facilities. The most of these plants, for various reasons, do not produce electricity. One such plant is "Energetika" (Kragujevac, Serbia), which is primarily a district heating company. Steam generator in the plant has been installed in the 1970's and has worked in one short period of time. Installed steam turbines are 8 MW and 20 MW rated power. “Energetika” in accordance with the general trend of increasing energy efficiency of production process initiated revitalization of the plant. This revitalization started with a study which approach and the results are briefly given in the paper. All results show that retrofit of facility should be acceptable for the management. Developed scenarios indicate that in the case of the limited resources optimal retrofit should start with smaller turbine (8 MW rated power) then after providing the funds should continue with the retrofit of 20 MW turbine.
机译:今天,在塞尔维亚,有几个站点安装了热电联产设施。由于种种原因,这些电厂大多数都不发电。这样的工厂之一就是“ Energetika”(塞尔维亚的克拉古耶瓦茨),它主要是一家区域供热公司。该厂的蒸汽发生器已于1970年代安装,并在短时间内工作。安装的蒸汽轮机的额定功率为8 MW和20 MW。 “ Energetika”按照提高生产过程能源效率的总体趋势启动了工厂的振兴。这种振兴始于对哪种方法的研究,并在本文中简要给出了结果。所有结果表明,设施的改造应为管理层所接受。已开发的方案表明,在资源有限的情况下,最佳改造应从较小的涡轮机(额定功率为8 MW)开始,然后在提供资金后应继续进行20 MW涡轮机的改造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号