...
首页> 外文期刊>Procedia Manufacturing >Suzhal – An Alternative Layout to Improve Productivity and Worker Well-being in Labor Demanded Lean Environment
【24h】

Suzhal – An Alternative Layout to Improve Productivity and Worker Well-being in Labor Demanded Lean Environment

机译:Suzhal –在劳动密集型精益环境中提高生产率和工人福利的另一种布局

获取原文
           

摘要

Ergonomics continues to be relevant in work-places in which a significant amount of manual labor exists, such as in some of the Cellular manufacturing Systems (CMS). In order to distribute the workload evenly over all the workers in the line, some of the industries resorted to the practice of rotating all the workers through all workstations in the cell (Nagare cell) that prevents monotony and boredom. The presence of automated equipment in the cell will hamper this strategy for job rotation. This study aims to demonstrate the application of ergonomically designed looping layout in the assembly cell in the labor demanded lean manufacturing environment. The study was conducted in a process line in an automobile ancillary unit. The current process line which was conventional U-shaped line was simulated and the productivity has been verified and validated with the real life environment. Process map showed that the operators walked long distances, felt stress in certain workstations and that inventory piled up at the bottleneck workstation. We identify sub-cells within the cell. With the same manpower, we develop a new layout (Suzhal) and make workers rotate within each sub-cell. The proposed layout was simulated and results have been compared with the current layout. The analysis shows a reduction in the total operating cycle time, higher alertness among operators, better distribution of workloads in the group and hence higher productivity.
机译:人机工程学在存在大量体力劳动的工作场所中仍然很重要,例如在某些蜂窝制造系统(CMS)中。为了将工作量平均分配给生产线中的所有工人,某些行业采取了使所有工人轮流通过单元(Nagare单元)中所有工作站的做法,以防止单调和无聊。单元中自动化设备的存在将妨碍这种轮换工作策略。这项研究旨在证明在符合劳动要求的精益制造环境中,人体工程学设计的循环布局在装配单元中的应用。该研究是在汽车辅助设备的生产线中进行的。模拟了当前为常规U形生产线的生产线,并已在现实生活环境中对生产率进行了验证。流程图显示,操作员走了很长一段距离,在某些工作站上感觉到压力,并且库存积压在瓶颈工作站上。我们确定单元内的子单元。使用相同的人力,我们开发了新的布局(Suzhal),并使工作人员在每个子单元中旋转。模拟了建议的布局,并将结果与​​当前布局进行了比较。分析显示,总的操作周期时间减少了,操作员之间的警觉性提高了,组中工作负载的分配更好,从而提高了生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号