首页> 外文期刊>South African journal of industrial engineering >CLIENT PROJECT TIME SCHEDULE CONTROLS — AN EMPIRICALLY-BASED SYSTEM DYNAMICS CONCEPTUAL MODEL
【24h】

CLIENT PROJECT TIME SCHEDULE CONTROLS — AN EMPIRICALLY-BASED SYSTEM DYNAMICS CONCEPTUAL MODEL

机译:客户项目时间计划控制—基于经验的系统动力学概念模型

获取原文
           

摘要

Different project participants often have different objectives and expectations, and implement different controls aimed at advancing their interests. This article investigates project controls taken by the client during the project design stage to improve project time schedule performance. Dynamic hypotheses and a System Dynamics conceptual model of client controls and their ripple effects are formulated in this article from a combination of the existing literature, mental models of project managers gathered through an embedded multiple-case study, and Systems Thinking. The results suggest that client controls that are aimed at improving project time schedule performance generate ripple effects that worsen the performance.
机译:不同的项目参与者通常有不同的目标和期望,并实施旨在提高其利益的不同控制措施。本文研究了客户在项目设计阶段采取的项目控制措施,以改善项目时间表的性能。本文结合现有文献,通过嵌入式多案例研究收集的项目经理的心理模型以及“系统思维”,形成了动态假设和客户控件的系统动力学概念模型及其连锁反应。结果表明,旨在改善项目时间表性能的客户控制会产生连锁反应,使性能恶化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号