首页> 外文期刊>Scientific Research and Essays >Performance evaluation of the rubber dam project for irrigation development
【24h】

Performance evaluation of the rubber dam project for irrigation development

机译:灌溉开发用橡胶坝项目的绩效评估

获取原文
           

摘要

Rubber dam irrigation system for impounding surface water is a new technology in Bangladesh. It is important and priority in agricultural sector for sustainable irrigation water management due to scarcity of groundwater. The rubber dam project was evaluated to facilitate irrigation through proper use of water resources in the project area by conserving water for rabi crops. This study was evaluated by obtaining the values of some technical parameters like command area efficiency, management performance ratio, yield efficiency and benefit cost ratio and also the performance was evaluated the constraints to efficient water utilization and their remedy for irrigation development in the rubber dam project area at Nalitabari, Bangladesh. The rubber dam irrigation project was carried out by means of low lift pumps (LLPs) during the dry seasons. It was observed that water crisis was minimized during the dry seasons due to increased LLPs. It was found in the project area that command area efficiency ranged from 58.45 to 85.34% with an average value of 63.91%. Management performance ratio ranged from 0.012 to 0.114 with an average value of 0.028. Yield efficiency ranged 33 to 54 kg m-3with an average value of 41.8 kg m-3. Agricultural benefit was increased. Benefit-cost ratio ranged from 1.26 to 1.39 with an average value of 1.34. It was also found in the study area that a considerable number of performance constraints of the rubber dam irrigation project were identified to achieve the targeted successful output such as, lack of supply of electricity, improper management, lack of farmer’s co-ordination and lack of technician and lack of farmers’ participation during the implementation of the project.
机译:用来蓄积地表水的橡胶坝灌溉系统是孟加拉国的一项新技术。由于地下水的缺乏,在农业部门进行可持续灌溉水管理是重要和优先的。对橡胶坝项目进行了评估,以通过节水种植狂犬病作物来适当利用水资源,从而促进灌溉。通过获得命令区效率,管理绩效比,产量效率和效益成本比等一些技术参数的值对本研究进行了评估,并对绩效进行了评估,以评估橡胶坝项目中有效用水的制约因素及其对灌溉发展的补救措施孟加拉国纳利塔巴里(Nalitabari)地区。橡胶坝灌溉工程是在干旱季节通过低扬程泵(LLP)进行的。据观察,由于LLP的增加,干旱季节的水危机降到最低。在项目区发现指挥区效率在58.45%到85.34%之间,平均值为63.91%。管理绩效比在0.012到0.114之间,平均值为0.028。产量效率在33至54 kg m-3之间,平均值为41.8 kg m-3。农业收益增加。效益成本比在1.26至1.39之间,平均值为1.34。在研究区域还发现,确定了橡胶坝灌溉项目的相当多性能限制,以实现目标成功的产出,例如,电力供应不足,管理不当,缺乏农民的协调和缺乏技术人员和农民在项目实施过程中的参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号