In mining operation, blasts are used to fracture the in-situ rock mass and prepare it for excavation, crushing and grinding. The High-energy blasting, which uses increased amount of explosive material per tonne of rock, is considered to be one of most effective ways to reduce the consumption of energy in the milling process, resulting production saving as well as reduction in dust (PM5) and tailing. In this article, the main focus is to investigate the electrical intensity of the five grinding lines in the mill, as they accounted for the majority of site electricity consumption, in relations to other operational procedures, in particular the high-energy blasting. Several regression models were established, the data points were fitted within 10% of the actual values, and the majority within 5%. The models provide management better ways to predict and target electrical consumption and environmental impact.