The aim of this project is to simulate a Kanban system using N stages with the objective of maintaining an acceptable throughput and mean system? time.? The? document? shows? the? production systems where Kanban is applicable and what the potential benefi ts are. A serial of simulations will be done using a demand given by a poison distribution with rate λ ^ ext. The simulation aimed to fi nd the best number of withdrawal Kanban on all N? stages? when? the? values? of? μ??? (for? exponential distribution of the process) and λ ^ ext increase and? decrease. At? the? end? of? this? simulation,? the best way to allocate the withdrawal Kanban over N? stages? with? the? objective? of? maintaining? acceptable? throughput? and? mean? system? time? will be clearer thus the conclusions of this work will be done.
展开▼