首页> 外文期刊>Research journal of applied science, engineering and technology >Research on Construction Monitoring Techniques for Cable Replacement of the Cable-Stayed Bridge
【24h】

Research on Construction Monitoring Techniques for Cable Replacement of the Cable-Stayed Bridge

机译:斜拉桥换缆施工监控技术研究

获取原文
           

摘要

Due to various reasons, some cable-stayed bridges require the replacement of part or all stay cables after operating for a period of time. In this study, based on some engineering practices of stay cable replacement, the condition of bridge structure before replacement is analyzed with Finite Element Analysis method for plane member system. The theoretical calculations, cable force measurement, replacement methods and process monitoring for cable replacement are introduced to find out the key technical problems. From the specified bridge monitoring practices, we suggest monitoring cable tension and the main beam alignment during the process of cable replacement, to make sure the cable-stayed bridge reaches its design conditions.
机译:由于各种原因,某些斜拉桥在运行一段时间后需要更换部分或全部斜拉索。在这项研究中,根据一些斜拉索的工程实践,使用平面构件系统的有限元分析方法分析了斜拉索在更换前的桥梁结构状况。介绍了电缆的理论计算,电缆力测量,更换方法和更换电缆的过程监控,以找出关键的技术问题。根据指定的桥梁监测实践,我们建议在电缆更换过程中监测电缆张力和主梁对准,以确保斜拉桥达到其设计条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号