首页> 外文期刊>International Journal of Technology >Developing Conceptual Design of High Speed Railways using Value Engineering Method: Creating Optimum Project Benefits
【24h】

Developing Conceptual Design of High Speed Railways using Value Engineering Method: Creating Optimum Project Benefits

机译:使用价值工程方法开发高速铁路的概念设计:创造最佳项目收益

获取原文
           

摘要

As a consequence of an improvement in productivity, due to shorter travel time and further development in connectivity, a High Speed Train (HST) project is one kind of infrastructure which has a potential for positive impact on economic development and growth. However, HST project feasibility rarely meets related stakeholders’ expectations, since the benefits and added value are considered low, when compared to the value of investment. Therefore, a comprehensive study is required by producing innovative ideas to improve the feasibility of HST projects, from the viewpoint of both technical and economic aspects. This study is aimed at improving the feasibility of project investment for the conceptual design of Jakarta-Surabaya HST project by using Value Engineering (VE). The methodology uses both qualitative and quantitative approaches through in-depth interviews and life cycle cost analysis. Route 1 selected as the best scenario that has 4 stations connecting Jakarta to Cirebon to Semarang, and to Surabaya. The HST project requires a budget of 36 Trillion IDR with operational and maintenance costs estimated for about 1.2 Billion IDR per year for 685 km of high speed train infrastructure.
机译:由于缩短了旅行时间并进一步发展了连通性,从而提高了生产率,高速列车(HST)项目是一种基础设施,对经济发展和增长具有积极影响。但是,HST项目的可行性几乎无法满足相关利益相关者的期望,因为与投资价值相比,其收益和附加值被认为是低的。因此,需要从技术和经济角度出发,通过提出创新的想法来进行全面研究,以提高HST项目的可行性。这项研究旨在通过使用价值工程(VE)来提高雅加达-泗水HST项目概念设计项目投资的可行性。该方法通过深度访谈和生命周期成本分析,同时使用了定性和定量方法。路线1被选为最佳方案,其中有4个站点将雅加达,井里汶,三宝垄和泗水连接起来。 HST项目的预算为36万亿印尼盾,运营和维护成本估计为685公里的高速火车基础设施,每年约为12亿印尼盾。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号