What Negative Impact does Wind have on the Deadline of a Construction Project? Mathematical Modeling for the Measurement and Optimization of Wind Effects

机译:风电对建设项目的期限有什么负面影响?测量和优化风效应的数学模型

获取原文
           

摘要

In regard to economic phenomena such as the expansion of trade, the interactions between markets encouraging companies to cross borders, the research for market in new areas should be accompanied by sufficient knowledge of their own environment and especially the weather conditions. Indeed, the objectives of a construction project (cost, deadline and quality) are affected by a multitude of events, of internal and external origin, such as climate changes when they are severe and abrupt. Certainly, each region is characterized by a specific climate. For some regions, it is rather the wind that remains the most characterizing climate factor. Wind is widely felt in areas exposed to currents such as (trade wind, North wind, Nordet, Harmattan etc?), in other places we underestimate, see, ignore the effects of wind, particularly on a construction site. Yet, the consequences of ignoring this risk factor can be heavy on a construction company (in terms of late penalty law for example); In fact, if bad weather affects particularly on the initial works: earthworks, foundations, slab; wind effects may proclaim during all the duration of the construction site. The wind affect all project?s aspects, quality, cost, safety as well as deadline. Nevertheless there are few studies that were interested in studying relation construction?s deadline and wind. Tangier, the city located on the Strait of Gibraltar, where the study was conducted, is exposed to wind whose origin is the Anti cyclone of the Azores, in addition to the local winds that are due to the presence of the two seas and imposing mountains, with a wind that might exceed 220km/h. The equation introduced by this study will allow evaluating (measuring) the impact of wind on the deadline (expressed ?), it shall encompass all aspects: - Limiting conditions of equipments existing in construction site (producers? references) - Recommendations of the standard practice - Regulation in terms of work?s limits conditions in case of wind The Weibull function that will be used in the study, its formulation will be explained in a simple manner in the heart of the text. The tool introduced at the end, statistically designed in order to manage this risk consists of an iterative system targeting the automation of decision making, searching the minimal of ?_Global and thus creating the optimal planning; it refers to Pareto and MPM management rules.
机译:关于贸易扩展等经济现象,鼓励公司跨界的市场之间的相互作用,对新地区的市场研究应伴随着对其自身环境尤其是天气状况的充分了解。确实,建设项目的目标(成本,期限和质量)受到内部和外部来源的大量事件的影响,例如严重而突然的气候变化。当然,每个地区都有特定的气候特征。在某些地区,风仍然是最具代表性的气候因素。在暴露于潮流的区域(例如,顺风,北风,Norde,Harmattan等),人们普遍感觉到风,而在其他地方,我们低估了,看不见,却忽略了风的影响,尤其是在建筑工地上。然而,忽视这一风险因素的后果可能对建筑公司造成沉重的后果(例如,根据最新的刑罚法);实际上,如果恶劣的天气特别影响到最初的工程:土方工程,地基,平板;在施工现场的整个过程中都可能会产生风的影响。风影响所有项目的各个方面,质量,成本,安全性以及期限。然而,很少有研究对关系建设的期限和风向感兴趣。丹吉尔是研究的所在地,位于直布罗陀海峡,除因两海和雄伟的山脉所引起的局部风外,还暴露于起源于亚速尔群岛的反旋风的风中。 ,风速可能超过220 km / h。这项研究引入的等式将允许评估(测量)风对截止日期的影响(表示为?),它应涵盖所有方面:-施工现场存在的设备的限制条件(生产商?参考)-标准做法的建议-在风中根据工作的限制条件进行调节在研究中将使用Weibull函数,其表达方式将在本文的核心部分以简单的方式进行说明。最后引入的工具是经过统计设计以管理这种风险的工具,它包括一个针对决策自动化的迭代系统,搜索最小的_Global从而创建最佳的计划;它指的是Pareto和MPM管理规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号