Electric Power Transmission Line Faults in Nigeria: A Case Study of Benin-Irrua 132 KV Transmission Line

机译:尼日利亚的输电线路故障:贝宁-伊鲁阿132 KV输电线路案例

获取原文
           

摘要

This study highlight the faults analysis on Benin-Irrua 132 KV transmission line, associated with Benin District of Power Holding Company of Nigeria (PHCN). Data used for analysis covers a period of a year (July 2006 to June 2007). The analysis revealed the causes of different types of faults and problem associated with the 132 KV feeder between Benin-Irrua transmission line. A total of 71 faults occurred in a year, fault A has the highest frequency of occurrence. The month of January has the highest faults. The total duration of power outage in a year was 151 h. 06 min and also the month of October has the highest duration of power outage followed by July. The causes of faults on an Electric Power Transmission Line and the possible solution to reduce these faults will be of relevance to Power Holding Company of Nigeria (PHCN) and Power System Engineers.
机译:这项研究突出了与尼日利亚电力控股公司(PHCN)贝宁区相关的贝宁-伊鲁阿132 KV输电线路的故障分析。用于分析的数据涵盖一年的时间(2006年7月至2007年6月)。分析揭示了与贝宁-伊鲁阿输电线路之间的132 KV馈线有关的不同类型故障的原因和问题。一年中总共发生了71个故障,故障A的发生频率最高。一月份的故障最多。一年的总停电时间为151小时。 06分钟以及10月的停电时间最长,其次是7月。输电线路上的故障原因以及减少这些故障的可能解决方案,将与尼日利亚电力控股公司(PHCN)和电力系统工程师相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号