...
首页> 外文期刊>Information Technology Journal >Minimizing Maximum Tardiness in Single Computer Numerical Control Machine Scheduling with Tool Changes
【24h】

Minimizing Maximum Tardiness in Single Computer Numerical Control Machine Scheduling with Tool Changes

机译:通过换刀使单台计算机数控机床调度中的最大拖后处理最小化

获取原文
           

摘要

This study considers the problem of scheduling a set of jobs on a single Computer Numerical Control (CNC) machine where the cutting tool is subject to wear, aiming to minimize the maximum tardiness. Four mixed binary integer programming models were developed to solve this problem optimally. To solve large-sized problems, two heuristics were also developed. This study presents the computational results to demonstrate the efficiency of the models and the effectiveness of the heuristics.
机译:这项研究考虑了在单台计算机数控(CNC)机器上安排一组作业的问题,在该机器上,切削工具容易磨损,旨在最大程度地减少拖延时间。开发了四个混合二进制整数编程模型以最佳地解决该问题。为了解决大型问题,还开发了两种启发式方法。这项研究提出了计算结果,以证明模型的效率和启发式方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号