Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies

机译:识别和测量工程,采购和建设(EPC)关键绩效指标和管理策略

获取原文
       

摘要

Delay and cost overrun in construction projects are two widespread problems that arousepractitioners’ and scholars’ concern. Therefore, the objective of this study was to identify KeyPerformance Indicators (KPIs) in each of Engineering, Procurement and Construction (EPC) phasesseparately and then calculate the weight impact that is associated with each of identified KPIs.Additionally, this study aimed to find the most appropriate Best Practices (BPs) for the identifiedphase-based indicators. Through a review of existing literature, a survey was developed to collectdata from the completed construction projects. Various statistical methods, including two sampleT-test and Kruskal-Wallis test, were utilized to analyze the data. Subsequently, Epsilon-Squaredeffect size method was applied to prioritize the identified KPIs. Since the lack of communication andslowness in decision making were found as the primary schedule Performance Indicators, scheduleperformance was identified to be highly affected by managerial approaches and actions. In addition,clients play a decisive role, because owner-driven change orders were found as the most crucialcost performance indicator affecting the performance of the engineering and construction phases.The outcome of this study helps practitioners and scholars to understand the phase-based cost andschedule KPIs, and appropriate mitigating strategies to improve the construction performance inEPC phases and save time and money.
机译:建设项目的延误和成本超支是引起实践者和学者关注的两个普遍问题。因此,本研究的目的是分别识别各个工程,采购和建设(EPC)阶段的关键绩效指标(KPI),然后计算与每个已识别的KPI相关的重量影响。对于已确定的基于阶段的指标,最合适的最佳实践(BP)。通过回顾现有文献,开展了一项调查,以从已完成的建设项目中收集数据。各种统计方法,包括两个sampleT检验和Kruskal-Wallis检验,被用来分析数据。随后,使用Epsilon-平方效应大小方法对已确定的KPI进行优先排序。由于发现缺乏沟通和决策迟缓是主要的进度绩效指标,因此,进度绩效被确定为受管理方法和行动的高度影响。此外,客户起着决定性的作用,因为发现业主驱动的变更单是影响工程和施工阶段性能的最关键的成本绩效指标。这项研究的结果有助于从业人员和学者了解基于阶段的成本和进度关键绩效指标(KPI)和适当的缓解策略,以改善EPC阶段的施工性能并节省时间和金钱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号