...
首页> 外文期刊>ATBU Journal of Environmental Technology >Global risk factors affecting performance of construction firms in Abuja, Nigeria
【24h】

Global risk factors affecting performance of construction firms in Abuja, Nigeria

机译:影响尼日利亚阿布贾建筑公司业绩的全球风险因素

获取原文
           

摘要

The study assessed the Global Risk Factors (GRFs) affecting performance of Nigerian construction firms, with a view to identifying the most severe and appropriate risk response techniques. In order to achieve this aim, the severity of GRF across different categories of firms, and the risk response techniques most suitable for each GRF were examined. A total of 105 questionnaires were administered out of which a total of 49 were fully completed and returned. Descriptive statistics was used to analyse the data collected using Likert scales, while Analysis of variance was used to evaluate the similarities/differences in the views of different categories of construction firms. The findings show that most construction firms consider payment delays (mean = 2.65), poor project scope (mean = 2.40) and inadequate design information (mean = 2.39) as the most severe GRF affecting the performance of Nigeria construction firms. It was also discovered that, despite the high likelihood and impact of GRF such as; payment delays, design changes, and inflation/bank Interest rates amongst others, most firms still opted to “accept” them. On the other hand, poor project scopes, strikes, failure to meet clients need and all factors related to unethical practices were “avoided”, while all legal related risk factors were “mitigated”. It is hoped that these findings will help construction firms in developing countries such as Nigeria to be more aware of the effect of GRF in order to be able to assess them effectively before embarking on construction projects.
机译:该研究评估了影响尼日利亚建筑公司业绩的全球风险因素(GRF),以期确定最严格和最适当的风险应对技术。为了实现此目标,研究了不同类别公司的GRF的严重性以及最适合每个GRF的风险应对技术。共提交了105份问卷,其中49份已完全填写并归还。描述性统计数据用于分析使用李克特量表收集的数据,而方差分析则用于评估不同类别建筑公司的观点之间的相似性/差异。研究结果表明,大多数建筑公司将付款延迟(平均= 2.65),不良的项目范围(平均= 2.40)和设计信息不足(平均= 2.39)视为影响尼日利亚建筑公司业绩的最严重的GRF。还发现,尽管GRF的可能性和影响很大,例如:付款延误,设计变更以及通货膨胀/银行利率等等,大多数公司仍然选择“接受”它们。另一方面,“避免”了不良的项目范围,罢工,不能满足客户需求以及与不道德行为相关的所有因素,而“与法律相关的所有风险因素”均得到“缓解”。希望这些发现将有助于尼日利亚等发展中国家的建筑公司更加了解GRF的影响,以便能够在开始建设项目之前对其进行有效评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号