Explaining the Increase in the Australian Average House Completion Time:Activity-based versus Workflow-based Approach

机译:解释澳大利亚平均房屋完工时间的增加:基于活动的方法与基于工作流程的方法

获取原文
           

摘要

The Australian house building industry has been facing an increase in the average house completion time in the last decade. This increase in some states is quite dramatic. For instance, Western Australia has faced a 70 percent increase in the average house completion time during this period. This paper uses two planning approaches to explain this; i) the activity-based planning methods and ii) the workflow-based planning methods. In addition, this research investigates the strengths and weaknesses of these two planning approaches in explaining the behaviour of the house building industry. For this purpose, a national case study and five state case studies including Victoria, Western Australia, New South Wales, Queensland and South Australia have been used. The data related to the key parameters have been collected and their correlation with the average house completion time has been investigated. These key parameters include the average house floor area, the number of house completions and the number of houses under construction. The reasons for the increasing trend of the average house completion time have been postulated in all case studies. According to this research, the increase in the average house completion time cannot be explained using activity-based planning methods. In contrast, by using workflow-based planning methods, it has been shown that the average house completion time is correlated with the number of houses under construction. This paper shows that the average completion time is influenced directly by the workflow in the house building industry and that workflow planning should be the basis for the house building industry planning.
机译:在过去十年中,澳大利亚房屋建筑业的平均房屋建成时间一直在增加。在某些州,这种增加是非常显着的。例如,在此期间,西澳大利亚州的平均房屋完工时间增长了70%。本文使用两种计划方法对此进行解释。 i)基于活动的计划方法,以及ii)基于工作流的计划方法。此外,本研究调查了这两种规划方法在解释房屋建筑业行为方面的优缺点。为此,使用了国家案例研究和五个州案例研究,包括维多利亚州,西澳大利亚州,新南威尔士州,昆士兰州和南澳大利亚州。已经收集了与关键参数有关的数据,并研究了它们与平均房屋建成时间的相关性。这些关键参数包括平均房屋建筑面积,房屋完工数量和在建房屋数量。在所有案例研究中,均已推测出平均房屋完工时间增加的原因。根据这项研究,不能使用基于活动的计划方法来解释平均房屋完工时间的增加。相反,通过使用基于工作流的计划方法,已表明平均房屋竣工时间与在建房屋的数量相关。本文表明,房屋建筑行业的平均完成时间直接受到工作流程的影响,工作流程规划应成为房屋建筑行业规划的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号