...
首页> 外文期刊>Archives of civil engineering >Multivariate Information Dynamic Monitoring System Application of Tunnel Construction Process Model Test
【24h】

Multivariate Information Dynamic Monitoring System Application of Tunnel Construction Process Model Test

机译:多元信息动态监测系统在隧道施工过程模型试验中的应用

获取原文
           

摘要

Geomechnical model testing has been widely applied as a kind of research technique in underground engineering problems. However, during the practical application process, due to the influence of many factors, the desired results cannot be obtained. In order to solve this problem, based on the measurement requirements of the model test, combined with FBG(Fiber Bragg Grating) sensor technology and traditional measurement methods, an FBG monitoring system, Micro-multi-point displacement test system, resistance strain test system and surrounding rock pressure monitoring system are developed. Applying the systems to a model test of the tunnel construction process, the displacement in advance laws of tunnel face, radial displacement distribution laws and surrounding rock pressure laws are obtained. Test results show that a multivariate information monitoring system has the advantage of high precision, stability and strong anti-jamming capability. It lays a solid foundation for the real-time data monitoring of the tunnel construction process model test.
机译:地质力学模型测试作为一种地下工程问题的研究技术已被广泛应用。但是,在实际应用过程中,由于许多因素的影响,无法获得理想的结果。为了解决这个问题,根据模型测试的测量要求,结合FBG(光纤光栅)传感器技术和传统的测量方法,建立了FBG监测系统,微多点位移测试系统,电阻应变测试系统。开发了围岩压力监测系统。将系统应用于隧道施工过程的模型试验,获得了隧道工作面提前位移规律,径向位移分布规律和围岩压力规律。测试结果表明,该系统具有精度高,稳定性好,抗干扰能力强的优点。为隧道施工过程模型试验的实时数据监测奠定了坚实的基础。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号