...
首页> 外文期刊>Applied Sciences >Evaluating the Impact of the Sudden Collapse of Major Freeway Connectors on Rapid Transit and Adjacent Freeway Systems: San Francisco Bay Area Case Study
【24h】

Evaluating the Impact of the Sudden Collapse of Major Freeway Connectors on Rapid Transit and Adjacent Freeway Systems: San Francisco Bay Area Case Study

机译:评价主要高速公路连接器突然坍塌对快速公交系统和邻近高速公路系统的影响:旧金山湾区案例研究

获取原文
           

摘要

The early Sunday morning collapse of two sections of the multi-level freeway interchange, known as the MacArthur Maze, resulted in a month-long closure of the interchange, which connects several major California cities: San Francisco, Oakland, and Berkeley. This paper evaluates the impacts of this unplanned, extended closure on Bay Area Rapid Transit (BART) and the remaining freeway system based on empirical data and reports on the findings. Among the findings were that BART was instrumental in keeping commuters moving during the freeway repair. In addition, ridership counts at some stations remained significantly elevated after the repairs were completed. This may be due to the fact that many of the riders using those BART stations had not previously traveled via transit and, having discovered its convenience and benefits during the repair phase, continued to use BART even after the repairs. The impact of the closure on BART demand was not uniform across the stations.
机译:周日清晨,多层高速公路立交桥(称为MacArthur Maze)的两部分坍塌,导致该立交桥关闭了一个月,该立交桥连接了加利福尼亚的几个主要城市:旧金山,奥克兰和伯克利。本文根据经验数据评估了这一计划外,长期关闭的封闭措施对海湾地区快速公交(BART)和其余高速公路系统的影响,并报告了调查结果。调查结果包括BART在高速公路维修过程中有助于通勤者的移动。此外,维修完成后,某些车站的乘客人数仍显着增加。这可能是由于以下事实:使用这些BART站的许多骑手以前从未经过过公交旅行,并且在维修阶段发现了其便利性和优势,即使在维修后仍继续使用BART。关闭对各站BART需求的影响并不统一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号