...
首页> 外文期刊>African Journal of Environmental Science and Technology >Ecological baseline survey of the Takoradi T2 expansion and a once-through cooling system project site, Aboadze, Ghana
【24h】

Ecological baseline survey of the Takoradi T2 expansion and a once-through cooling system project site, Aboadze, Ghana

机译:Takoradi T2扩建和一次冷却系统项目站点的生态基线调查,加纳阿博阿兹

获取原文
           

摘要

The Environmental Assessment Regulations (LI 1652) of Ghana mandates all bodies undertaking activities that may significantly impact the environment to conduct Environmental Impact Assessment. It is in accordance with this legal provision that an Ecological Baseline Survey was conducted at the Takoradi Thermal Power Plant (TTPP) site located 2 km East of Aboadze near Takoradi to determine the existing flora and fauna and the potential impacts of the T2 Expansion Project on them. Data on the flora and fauna of the project site was gathered through primary and secondary sources such as desk study of previous reports, field survey, focus group discussions and a town-hall meeting. It was discovered that the coastal ecosystem of the project area was fairly pristine except for routine grazing and anthropogenic activities. Biodata collected indicated the predominance of invertebrates, coconut palms, sisals and grasses; while reptiles and small mammals (rodents) were also observed. No turtle nesting sites were observed. Potential impacts of the project include: displacement of aquatic flora and fauna, contamination of marine and terrestrial ecosystems and distortion of food webs. Despite the foregoing, the socioeconomic significance of the T2 expansion project to Ghana is crucial and is worth the ecological trade-off. It was recommended among others for ornamental plants to be planted along the streets of the plant upon completion of the project.
机译:加纳的《环境评估条例》(LI 1652)要求所有从事可能对环境产生重大影响的活动的机构进行环境影响评估。根据该法律规定,在位于塔科拉迪附近阿博阿兹以东2公里的塔科拉迪热电厂(TTPP)现场进行了生态基线调查,以确定现有动植物以及T2扩展项目对Takoradi的潜在影响他们。通过主要和次要来源收集了项目场地的动植物数据,例如以前报告的案头研究,现场调查,焦点小组讨论和市政厅会议。人们发现,除了常规的放牧和人为活动外,项目区域的沿海生态系统还相当原始。收集的生物数据表明,无脊椎动物,可可椰子,剑麻和草占多数。同时也观察到了爬行动物和小型哺乳动物(啮齿动物)。没有观察到海龟筑巢的地点。该项目的潜在影响包括:水生动植物的迁徙,海洋和陆地生态系统的污染以及食物网的变形。尽管有上述规定,T2扩建项目向加纳的社会经济意义至关重要,值得生态权衡。建议在项目完成后在植物的街道上种植观赏植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号