Rail transport is an energy-efficient and capital-intensive means of mechanized land transport. Methods of tunneling vary with the nature of the material to be cut through. When soft earth is encountered, the excavation is timbered for support as the work advances; the timbers are sometimes left as a permanent lining for the tunnel. Another method is to cut two parallel excavations in which the side walls are constructed first. Arches connecting them are then built as the material between them is extracted. Portions of the unexcavated center, left temporarily for support, may be removed later. A tunnel cut through rock frequently requires no lining. Often, to speed construction, work is started at both ends. This poses no problem with the cut-and-cover method, but when the tunnel is bored from within, it must be assured that the tubes will actually meet in the center. Modern methods accomplish this with high precision.
机译:铁路运输是一种高效节能且资本密集的机械化土地运输方式。隧穿的方法随所切材料的性质而异。当遇到软土时,随着工作的进行,开挖的木料被用作支撑。有时将木材留作隧道的永久衬砌。另一种方法是切割两个平行的基坑,其中首先建造侧壁。然后在提取它们之间的材料时建立连接它们的拱门。未挖掘的中心部分暂时留作支撑,以后可以拆除。穿过岩石的隧道通常不需要衬砌。通常,为了加快施工速度,两端都要开始工作。采掘法不会带来任何问题,但是当隧道是从内部钻孔时,必须确保管道实际上会在中心汇合。现代方法可以高精度地完成此任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号