首页> 外文期刊>Acta Montanistica Slovaca >Das System Szkody wer. 4.0 als Unterstützung im Bau der A4-Autobahn im Bereich der Deformation des Bergbaugebiets
【24h】

Das System Szkody wer. 4.0 als Unterstützung im Bau der A4-Autobahn im Bereich der Deformation des Bergbaugebiets

机译:Szkody系统是谁。 4.0作为矿区变形地区A4高速公路建设的支持

获取原文
           

摘要

The paper presents a system created in the Main Institute of Mining. The system called SZKODY ver. 4.0. is a 32-bit version of system allowing very quick calculation of deformations in Windows. Numerous tool programs allow, among others, graphical outlook of the calculated deformations in the areas of the grids of calculation points, assistance in making the timetable of mining, assessment of the amount of deposit, making auxiliary files for maps and graphs, etc. The examples of the application of this system as the support in the forecasting and the analysis of the measured deformations during the building of A4 motorway, especially the distance Wirek junction –Batory junction are given.
机译:本文介绍了在矿业总学院创建的系统。该系统称为SZKODY ver。 4.0是系统的32位版本,可以非常快速地计算Windows中的变形。除其他功能外,许多工具程序还可以图形化地显示计算点网格区域中所计算出的变形,协助制定采矿时间表,评估矿床量,制作地图和图形的辅助文件等。举例说明了该系统在预测和分析A4高速公路建设过程中测得的变形,尤其是Wirek交汇点至Batory交汇点距离方面的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号