首页> 外文期刊>Acta Montanistica Slovaca >Management of metrology in measuring of the displacement of building construction
【24h】

Management of metrology in measuring of the displacement of building construction

机译:测量建筑结构位移的计量管理

获取原文
           

摘要

The metrology management of the measurement of the displacement of building construction is not regulated in the standard ?SN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project). Then we have to pay an attention to the metrological management during this measurement (Stage of realization) and during the evaluation of this measurement (Stage of evaluation). We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback). The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.
机译:在标准?SN ISO 73 0405-建筑物位移的测量中,未对建筑物位移的测量进行计量管理。但是,计量管理必须包含在位移测量项目中(项目阶段)。然后,我们必须在此度量(实现阶段)和评估此度量(评估阶段)期间注意度量管理。我们必须坚持在下一个项目的框架内改进计量管理(所谓的反馈)。在阶段位移测量中的计量管理应基于法定仪器和技术标准的应用。我们应该特别坚持质量控制ISO 9000的标准体系。考虑到大地测量的特殊性,有必要采用计量管理。这就是为什么它将在其他知识领域与计量管理有所不同的原因。本文包括一些不可忽视的计量步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号