首页> 外文期刊>British Journal of Applied Science and Technology >Analysis of Steam Power Plant at Kaduna Refiningand Petrochemical Company from ExergeticPerspective
【24h】

Analysis of Steam Power Plant at Kaduna Refiningand Petrochemical Company from ExergeticPerspective

机译:从Exergetic角度分析卡杜纳炼油石化公司蒸汽电厂。

获取原文
           

摘要

This study presents the exergetic analysis of steam power plant at kaduna refining and petrochemical company limited. The aim of this research is to analyze the system components separately, and to identify and quantify the sites having the largest exergy losses. The performance of the plant was established and detailed break-up of exergy destruction of the considered plant has been presented. Computer softwares (ASPEN HYSYS, AUTOCAD and MICROSOFT EXCEL) were used for the simulation and calculation of properties that include stream enthalpy and entropy using the flow rate, working temperature and pressure of each equipment gotten from the company, at an assumed dead state temperature of 25ºC at pressure of 101KPa. The analysis shows that The total exergy destroyed in the system is 209000kW, which makes about 18% of the total exergy entering the system The site having the largest exergy destruction was found to be in the boiler, having a 20000KW destroyed with a percentage performance loss of 36%, followed by the condenser, with 5880KW destroyed and percentage performance loss of 6%.Where as other equipments have total exergy efficiency of 2%. At end of this study, it can be suggested that the air for combustion should be properly preheated and the boilers should be properly lagged to avoid work loss. Analysis should be done periodically for each unit of the plant as a performance test; this will be helpful for maintenance and replacement decisions.
机译:本研究对卡杜纳炼油和石化有限公司的蒸汽发电厂进行了详尽的分析。本研究的目的是分别分析系统组件,并确定和量化具有最大火用损失的位置。确定了该植物的性能,并详细介绍了该植物的火用破坏。计算机软件(ASPEN HYSYS,AUTOCAD和MICROSOFT EXCEL)用于模拟和计算特性,包括使用公司生产的每台设备的流量,工作温度和压力在假定的死态温度下的流焓和熵。 25ºC,101KPa压力。分析表明,系统中被破坏的总火用为209000kW,约占进入系统的总火用的18%。发现有最大火用破坏的站点位于锅炉内,被破坏的20000KW,造成一定的性能损失36%,其次是冷凝器,其中5880KW被破坏,百分比性能损失为6%。其他设备的总火用效率为2%。在研究结束时,建议燃烧用的空气应适当预热,锅炉应适当滞后以避免工作损失。应该对工厂的每个单元进行定期分析,作为性能测试;这将有助于维护和更换决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号