...
首页> 外文期刊>Cadernos de Saúde Pública >Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory
【24h】

Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory

机译:机场建设项目中的异常与矛盾:基于文化历史活动理论的历史分析

获取原文
           

摘要

Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport’s AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project’s complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project’s phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.
机译:大型建设项目涉及网络格式的复杂活动系统(AS)的功能。异常,事故,延误,返工等异常现象可以用系统中历史上出现的矛盾来解释。这项研究的目的是分析机场建设项目的历史,以了解AS中当前的矛盾和异常以及它们如何出现。为此,进行了案例研究,将集体工作分析,访谈,观察和文档分析相结合,为变更实验室的会议提供了基础,变更实验室详细说明了参与者的时间表以及建设项目期间的主要事件。根据时间表,对机场AS进行的历史分析显示了关键的历史事件和矛盾现象,这些事件和矛盾现象说明了项目期间发生的异常情况。分析表明,该机场的建设计划已在政治上确定,但期限不足,且与项目的复杂性不一致。合同模式的选择是项目的所有阶段的责任,这是另一个关键的历史事件,因为它允许在起草最终的执行项目之前启动建设。在具有时间压力和活动外包而没有必要协调的情况下,首次合作的公司中也存在不同的文化。事实证明,识别这些矛盾及其历史渊源对于了解当前局势以及为防止今后发生类似局势所作的努力至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号