首页> 外文期刊>Design Products and Applications >Gold mine switches to Watson-Marlow Qdos and Bredel APEX pumps
【24h】

Gold mine switches to Watson-Marlow Qdos and Bredel APEX pumps

机译:金矿开关到Watson-Marlow QDOS和BEDEL APEX泵

获取原文
获取原文并翻译 | 示例
           

摘要

Deployed in two important applications, Harte Gold Corporation is now enjoying far better flow rate efficiency, along with significant reductions in both maintenance requirements and downtime. The company is subsequently looking to invest in further pumps from WMFTG. Harte Gold operates the wholly owned Sugar Zone Mine, located on the Day-ohessarah greenstone belt in Ontario. The mine entered commercial production in 2019 and has an operating life of approximately 13 years at current output levels. Producing 60,000 to 65,000 ounces of gold per year at 800tpd (tons per day) throughput rate, a mine expansion study is currently in progress to support 1200tpd.
机译:Harte Gold Corporation部署在两个重要的应用中,现在享有更好的流量效率,以及维护要求和停机时间的显着减少。 该公司随后希望从WMFTG投资进一步的泵。 Harte Gold经营全资糖区矿,位于安大略省的Ohehessarah Greenstone腰带。 该矿井于2019年进入商业生产,在当前产出水平下有大约13年的经营寿命。 每年在800TPD(每天吨)吞吐量率为每年60,000至65,000盎司,目前正在进行推出1200TPD的矿山扩展研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号