首页> 外文期刊>Design products & applications >An example of 'out-of-sight' engineering at its best
【24h】

An example of 'out-of-sight' engineering at its best

机译:最好的“视线外”工程示例

获取原文
获取原文并翻译 | 示例
           

摘要

Wimbledon's staff closed the Centre Court's new retractable roof for the first time in competition on Monday, June 29 2009 after light rain stopped play during the second set of a match on Centre Court. The new feature, which received a great deal of publicity during this year's tournament, is an excellent example of precision positioning control using electric motors and actuators to move structures weighing a combined 1,100 tonnes.rnThe Wimbledon retractable roof consists of two sections (on the southern and northern sides of the Centre Court), which together support 5,200m~2 of translucent, waterproof fabric when deployed. The 1,100 tonne structure, comprising ten trusses, each weighing 110 tonnes, is guided along two sets of parallel rails over a span of 77m with a tolerance of 2 to 3mm - all in less than ten minutes. The retracting mechanism is operated and controlled by a system of servomotors and electric actuators designed and supplied by Moog Industrial Group's Tewkesbury plant, with special locking actuators designed and supplied by Fraserburgh based Power Jacks.
机译:温布尔登的工作人员于2009年6月29日星期一在比赛中首次关闭中心球场的新可伸缩屋顶,原因是第二场比赛中心球场的小雨停止了比赛。这项新功能在今年的比赛中广为宣传,是使用电动马达和执行器移动重达1,100吨结构的精确定位控制的一个很好的例子。rn温布尔登可伸缩屋顶由两部分组成(在南部)和中央法院的北侧),在部署时共同支撑5,200m〜2的半透明防水织物。这座重1,100吨的结构由十个桁架组成,每个桁架重110吨,沿着两组平行的导轨在77m的跨度内以2至3mm的公差引导-全部在不到十分钟的时间内完成。伸缩机构由Moog Industrial Group Tewkesbury工厂设计和提供的伺服电机和电动执行器系统,以及由Fraserburgh的Power Jacks设计和提供的特殊锁定执行器来控制。

著录项

  • 来源
    《Design products & applications》 |2009年第11期|21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号