...
首页> 外文期刊>Desalination and water treatment >Removal of lead from aqueous solutions by precipitation: statistical analysis and modeling
【24h】

Removal of lead from aqueous solutions by precipitation: statistical analysis and modeling

机译:通过沉淀去除水溶液中的铅:统计分析和建模

获取原文
获取原文并翻译 | 示例
           

摘要

Chemical precipitation is the most common technology for the removal of dissolved metals from industrial wastewater. In this study, the removal of Pb(II) from aqueous solutions by precipitation was investigated and factorial design was applied. The effects of three variables i.e. pH, mass of precipitating agent, and precipitation time on the removal of lead were evaluated. The significance of the effects was checked by analysis of variance within a 95% confidence level. The model function equation for lead removal was obtained. Analysis of variance, t-test, and F-test showed that the precipitation time (C) had the greatest effect on Pb(II) removal, followed by mass of precipitating agent (B), pH (A), mass of precipitating agent-precipitation time (BC), and pH-precipitation time (AC). The maximum Pb(II) removal efficiency obtained at the optimum conditions was 99.42%. The removal of Pb(II) from industrial effluent was also studied.
机译:化学沉淀是从工业废水中去除溶解金属的最常用技术。在这项研究中,研究了通过沉淀从水溶液中去除Pb(II)的方法,并进行了析因设计。评价了三个变量,即pH,沉淀剂的质量和沉淀时间对铅去除的影响。通过在95%置信水平内的方差分析来检查效果的显着性。获得了去除铅的模型函数方程。方差分析,t检验和F检验表明,沉淀时间(C)对Pb(II)去除的影响最大,其次是沉淀剂质量(B),pH(A)和沉淀剂质量-沉淀时间(BC)和pH-沉淀时间(AC)。在最佳条件下获得的最大Pb(II)去除效率为99.42%。还研究了从工业废水中去除Pb(II)的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号