Al Dur SWRO plant: a double challenge for pre- and post-treatments

机译:Al Dur SWRO工厂:预处理和后处理的双重挑战

获取原文
获取原文并翻译 | 示例
           

摘要

The Al Dur Power & Water Company is a 2.1 billion USD gas-fired greenfield power generation and seawater reverse osmosis desalination plant that is located on the southeast coast of Bahrain. The company Degremont has been selected to design and build the Reverse Osmosis (RO) desalination plant, for a drinking water production capacity of 218,000 m~3/day. The plant design had to answer to particularly challenging requirements, both for the pre-treatment and for the post-treatment steps. The pre-treatment step is one of the key factors for the success of desalination using the reverse osmosis process. Its purpose is to remove the major foulants, which can be found in the seawater to allow for a reliable operation of the reverse osmosis units. It is even more essential within the Gulf area, where the seawater contains high concentrations of organics and is subject to algal blooms. Al Dur RO plant was thus designed with an efficient two-step pre-treatment process: a flotation step, including an enhanced coagulation stage, and a filtration step. In parallel, to assess the seawater variability and demonstrate the performances of the selected pre-treatment line, a pilot study was carried out on-site during one year. Al Dur drinking water objectives were particularly challenging and the design had to incorporate unusual guarantees such as a Silt Density Index below 3.0% /min, a turbidity below 0.2 NTU and a Langelier Saturation Index between 0.1 and 0.3. As a consequence, to comply with both the Bahraini drinking water standards and the tender specifications, the Al Dur mineralization unit design included a high velocity lime water saturator and a lime water filtration unit. The present paper describes the pre- and post-treatment performances based on the initial project design, the pilot study and the on-site results during the commissioning and the first few months of operation.
机译:Al Dur Power&Water Company是一家耗资21亿美元的天然气绿地发电和海水反渗透淡化厂,位于巴林的东南海岸。 Degremont公司已被选中设计和建造反渗透(RO)海水淡化厂,其饮用水生产能力为218,000 m〜3 / day。工厂的设计必须应对特别具有挑战性的要求,包括预处理步骤和后处理步骤。预处理步骤是使用反渗透工艺成功实现脱盐的关键因素之一。其目的是去除海水中可能存在的主要污垢,以确保反渗透装置的可靠运行。在海湾地区,海水中含有高浓度的有机物,藻类大量繁殖,因此这一点尤为重要。因此,Al Dur RO工厂的设计采用了有效的两步预处理过程:浮选步骤(包括增强的凝结步骤)和过滤步骤。同时,为了评估海水的变化并证明所选预处理管线的性能,在一年中在现场进行了一项试点研究。 Al Dur饮用水的目标特别具有挑战性,设计必须纳入不同寻常的保证,例如淤泥密度指数低于3.0%/ min,浊度低于0.2 NTU和Langelier饱和指数介于0.1和0.3之间。因此,为符合巴林饮用水标准和招标规范,Al Dur矿化装置的设计包括高速石灰水饱和器和石灰水过滤装置。本文根据初始项目设计,试点研究以及调试和运行的最初几个月的现场结果,介绍了预处理和后处理的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号