首页> 外文期刊>US Defense Budget Forecast >DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2018 EMERGENCY AND OVERSEAS CONTINGENCY OPERATIONS (OCO) AMENDMENTS
【24h】

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2018 EMERGENCY AND OVERSEAS CONTINGENCY OPERATIONS (OCO) AMENDMENTS

机译:海军财政年度(FY)部门应急和海外应急行动(OCO)修正案

获取原文
           

摘要

AMENDED BUDGET REQUEST JUSTIFICATION: : $29.7 million OCO is required to address emergency warfighting readiness requirements for RDT&E Project 3177, JointrnCounter Radio- Controlled IED Electronic Warfare (JCREW). Navy assigned requirement to provide additional Counter Unmanned Aerial System (C-UAS) capability in the continuedrnresponse to JUON CC-0558. Enhanced performance will be required to maintain capability against the evolving UAS threat. These enhancements will require development and testingrnof hardware and software/firmware upgrades to support C-UAS capabilities. This is not a new start. More details available at a higher classification.
机译:修订后的预算申请理由::需要2970万美元的OCO来满足RDT&E项目3177(JointrnCounter无线电控IED电子战(JCREW))的应急战备要求。海军要求继续对JUON CC-0558作出响应,以提供额外的反无人机系统(C-UAS)功能。需要增强性能来维持抵抗不断发展的UAS威胁的能力。这些增强将需要开发和测试硬件和软件/固件升级,以支持C-UAS功能。这不是一个新的开始。更高的分类提供更多详细信息。

著录项

  • 来源
    《US Defense Budget Forecast》 |2017年第11期|1-182|共182页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号