首页> 外文期刊>Decision support systems >Selecting infrastructure maintenance projects with Robust Portfolio Modeling
【24h】

Selecting infrastructure maintenance projects with Robust Portfolio Modeling

机译:通过强大的投资组合模型选择基础架构维护项目

获取原文
获取原文并翻译 | 示例
           

摘要

Project portfolios for the annual maintenance of infrastructure assets may contain dozens of projects which are selected out of hundreds of candidate projects. In the selection of these projects, it is necessary to account for multiple evaluation criteria, project interdependencies, and uncertainties about project performance as well as financial and other relevant constraints. In this paper, we report how Robust Portfolio Modeling (RPM) has been used repeatedly at the Finnish Transport Agency (FTA) for bridge maintenance programming. At FTA, project selection decisions are guided by the RPM's Core Index values which are derived from portfolio-level computations and reflect incomplete information about the relative importance of evaluation criteria. To-date, this application has been rerun with fresh data for six consecutive years. By drawing on experiences from this application, we discuss preconditions for the successful use of RPM or other methods of Portfolio Decision Analysis in comparable settings. We also develop an approximative algorithm for computing non-dominated portfolios in large project selection problems. (C) 2015 Elsevier B.V. All rights reserved.
机译:用于基础设施资产年度维护的项目组合可能包含数十个项目,这些项目是从数百个候选项目中选出的。在选择这些项目时,有必要考虑多个评估标准,项目相互依赖性以及项目绩效的不​​确定性以及财务和其他相关限制。在本文中,我们报告了芬兰运输局(FTA)如何反复使用稳健的资产组合模型(RPM)进行桥梁维护编程。在自由贸易区,项目选择决策由RPM的核心指数值指导,该值是从投资组合级别的计算得出的,反映了有关评估标准相对重要性的不完整信息。迄今为止,该应用程序已经连续六年用新数据重新运行。通过借鉴此应用程序的经验,我们讨论了在可比较的环境中成功使用RPM或投资组合决策分析的其他方法的前提条件。我们还开发了一种近似算法,用于计算大型项目选择问题中的非主导投资组合。 (C)2015 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号