首页> 外文期刊>Cost engineering >SECTION NEWS FROM AROUND THE WORLD
【24h】

SECTION NEWS FROM AROUND THE WORLD

机译:世界各地的新闻

获取原文
获取原文并翻译 | 示例
           

摘要

The Arizona Section monthly meeting wasrnOct. 21, 2010, at Kitchell's Training Centerin Phoenix,rnAZ. The featured guest speaker; Scott Root, Directorrnof Virtual Construction for Kitchell Contractors, presented on, "Building Information Modeling" (BIM). He discussed BIM as a tool to manage multi-discipline information in order to facilitate practical solutions for project design and construction challenges. He laid emphasis on how BIM has become a major factor in not only managing 3D system coordination but also becoming integral in all phases of construction project - preconstruction through closeout. He also demonstrated how a 4D BIM schedule simulation can be used to communicate complex construction sequences and site logistics to all the project stakeholders.
机译:亚利桑那州分部的月度会议是10月。 2010年2月21日,在美国亚利桑那州凤凰城的Kitchell培训中心。特邀演讲嘉宾; Kitchell Contractors的Directorrnof虚拟建筑总监Scott Root在“建筑信息模型”(BIM)上作了介绍。他讨论了BIM作为管理多学科信息的工具,以促进针对项目设计和施工挑战的实用解决方案。他强调BIM如何不仅成为管理3D系统协调的主要因素,而且如何成为建筑项目各个阶段不可或缺的组成部分-从结束前的预施工。他还演示了如何使用4D BIM进度表模拟将复杂的施工顺序和现场物流传达给所有项目涉众。

著录项

  • 来源
    《Cost engineering》 |2011年第1期|p.36-40|共5页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号