首页> 外文期刊>Cost engineering >PREC0NSTRUCT10N PHASE RISK ASSESSMENT FOR GMP CONTRACTS
【24h】

PREC0NSTRUCT10N PHASE RISK ASSESSMENT FOR GMP CONTRACTS

机译:GMP合同的PREC0NSTRUCT10N相风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

Project owners continue to be challenged with cost and schedule uncertainty in project development and seek more assurance through the use of various project delivery methods. The purpose of this article is to introduce project owners to a variety of project controls tools available to them and their project team when advancing projects through the design and preconstruction phases of a guaranteed maximum price (GMP) project delivery. This article will overview traditional project management and risk management techniques and also introduces more advanced statistical techniques. All of the information and recommendations provided by this article will allow owners to exercise varying degrees of diligence when advancing projects through the design and preconstruction phases. This article was first presented as PM.725 at the 2011 Annual Meeting.
机译:项目所有者继续面临项目开发中成本和进度不确定性的挑战,并通过使用各种项目交付方法寻求更多保证。本文的目的是向项目所有者介绍在保证最高价格(GMP)项目交付的设计和预建阶段推进项目时,他们及其项目团队可以使用的各种项目控制工具。本文将概述传统的项目管理和风险管理技术,并介绍更高级的统计技术。本文提供的所有信息和建议将使所有者在设计和预施工阶段推进项目时可以进行不同程度的努力。本文最初在2011年年会上作为PM.725提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号