首页> 外文期刊>Cost engineering >PRACTICES IN CONSTRUCTION CHANGE ORDER MANAGEMENT
【24h】

PRACTICES IN CONSTRUCTION CHANGE ORDER MANAGEMENT

机译:施工变更单管理实践

获取原文
获取原文并翻译 | 示例
           

摘要

Changes during most construction projects are inevitable and can lead to cost and schedule overruns. Effectively managing these changes can significantly reduce the risk of disputes and claims that often result in costly litigation. This article examines the various approaches to change management currently used in the industry and summarizes some of these practices. In addition, a case study involving the construction of a power plant impacted by a force majeure event that delayed the shipment of the major equipment for more than six months is discussed. Impacts to the project were tracked on a contemporaneous basis in order to efficiently quantify cost and schedule impacts for change order negotiations with the owner and for insurance recovery purposes. Some of the means and methods used on the project to track the impacts, including out-of-sequence work, winter conditions, stacking of trades, and others, are addressed in this article. The authors first presented this manuscript as CSC.607, at the 2011 AACE International Annual Meeting in Anaheim, CA.
机译:大多数建筑项目中的变更都是不可避免的,并且可能导致成本和进度超支。有效地管理这些变更可以显着降低通常导致昂贵的诉讼纠纷和索赔风险。本文研究了行业中当前使用的各种变更管理方法,并总结了其中的一些实践。此外,还讨论了一个案例研究,其中涉及受不可抗力事件影响的电厂建设,该事件将主要设备的运输延迟了六个月以上。同时跟踪对项目的影响,以便有效地量化成本和进度影响,以便与所有者进行变更单谈判并出于保险回收的目的。本文讨论了项目中用于跟踪影响的一些方法和方法,包括乱序工作,冬季条件,交易堆积等。在加利福尼亚州阿纳海姆市举行的2011年AACE国际年会上,作者首先将此手稿介绍为CSC.607。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号