首页> 外文期刊>Construction Management and Economics >Optimized maintenance and renovation scheduling in multifamily buildings - a systematic approach based on condition state and life cycle cost of building components
【24h】

Optimized maintenance and renovation scheduling in multifamily buildings - a systematic approach based on condition state and life cycle cost of building components

机译:优化多户住宅的维护和翻新计划-基于建筑物组件状态状态和生命周期成本的系统方法

获取原文
获取原文并翻译 | 示例
           

摘要

Proactive maintenance strategies in principle are devised to control degradation and sustain optimal performance of building components. While realizing the technical necessities, they also serve as an instrument towards multiple and often conflicting objectives during financial constraints. An optimal proactive maintenance strategy therefore should comprise a multiannual maintenance action plan optimized on different criteria corresponding to owners' objectives under existing constraints. This study offers a systematic approach based on a condition-deterioration model to address the complexity involved in decision making regarding optimized maintenance and renovation planning. Life-cycle cost analysis in form of Equivalent Annual Cost (EAC) is used for the economic assessment of maintenance/renovation scenarios. In this paper, the model is used to compare the economy of different maintenance/renovation plans in a chosen scenario in order to determine the optimal maintenance interval for a single and a combination of building components. Two facade elements, windows and facade rendering, are used to illustrate the application of the proposed method. This method is intended to help decision makers at both design and post-construction phases in the choice of both building components and maintenance/renovation strategies.
机译:原则上制定了主动维护策略,以控制退化并维持建筑组件的最佳性能。在意识到技术上的必要性的同时,它们还可以作为实现财务困难期间实现多个目标(通常是相互冲突)的工具。因此,最佳的主动维护策略应包括一项多年维护行动计划,该计划应根据与现有限制条件下所有者的目标相对应的不同标准进行优化。这项研究提供了一种基于条件恶化模型的系统方法,以解决与优化维护和翻新计划有关的决策制定所涉及的复杂性。以等效年成本(EAC)形式进行的生命周期成本分析用于维护/翻新方案的经济评估。在本文中,该模型用于比较所选方案中不同维护/翻新计划的经济性,从而确定单个或多个建筑组件的最佳维护间隔。使用两个立面元素(窗口和立面渲染)来说明该方法的应用。该方法旨在帮助决策者在设计和施工后阶段选择建筑构件和维护/翻新策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号