...
首页> 外文期刊>Construction innovation >BIM-based framework for temporary facility layout planning in construction site A hybrid approach
【24h】

BIM-based framework for temporary facility layout planning in construction site A hybrid approach

机译:基于BIM的临时设施布局规划施工现场的框架一种混合方法

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - This paper aims to propose an innovative building information modelling (BIM)-based framework for multi-objective and dynamic temporary construction site layout design (SLD), which uses a hybrid approach of systematic layout planning (SLP) and mathematical modelling. Design/methodology/approach - The hybrid approach, which follows a step-by-step process for site layout planning, is designed to facilitate both qualitative and quantitative data collection and processing. BIM platform is usedto facilitate the determination of the required quantitative data, while the qualitative data are generated through knowledge-based rules. Findings - The multi-objective layout model represents two important aspects: layout cost and adjacency score. The result shows that the model meets construction managers' requirements in not only saving cost but also assuring the preferences of temporary facility relationships. This implies that the integration of SLP and mathematical layout modelling is an appropriate approach to deliver practical multi-objective SLD solutions. Research limitations/implications - The proposed framework is expected to serve as a solution, for practical application, which takes the advantage of technologies in data collection and processing. Besides, this paper demonstrates, by using numerical experimentation and applying Microsoft Excel Solver for site layout optimisation, how to reduce the complexity in mathematical programming for construction managers. Originality/value - The original contribution of this paper is the attempt of developing a framework in which all data used for the site layout modelling are collected and processed using a systematic approach, instead of being predetermined, as in many previous studies.
机译:目的 - 本文旨在提出一种创新的建筑信息建模(BIM),基于多目标和动态临时施工现场布局设计(SLD)的框架,其使用系统布局规划(SLP)的混合方法和数学建模。设计/方法/方法 - 混合方法,遵循现场布局规划的逐步处理,旨在促进定性和定量数据收集和处理。 BIM平台用于有助于确定所需的定量数据,而通过基于知识的规则生成定性数据。调查结果 - 多目标布局模型代表两个重要方面:布局成本和邻接分数。结果表明,该模型符合建设经理的要求,不仅节省成本,而且确保了临时设施关系的偏好。这意味着SLP的集成和数学布局建模是提供实用多目标SLD解决方案的适当方法。研究限制/含义 - 建议的框架预计将作为实际应用的解决方案,这是利用数据收集和处理中的技术的优势。此外,本文通过使用数值实验和应用Microsoft Excel求解器进行现场布局优化,如何降低施工管理人员数学规划的复杂性。原创性/值 - 本文的原始贡献是开发一个框架的尝试,其中使用系统方法收集和处理用于站点布局建模的所有数据,而不是预先预定,而不是预先定义,如在许多之前的研究中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号