Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach

机译:U形工人分配装配线平衡问题的符合人体工程学风险和循环时间最小化:多目标方法

获取原文
获取原文并翻译 | 示例
           

摘要

Workers still perform the bulk of operations in the manufacturing industry. The consideration of the assignment of workers and the reduction of ergonomic risks in U-shaped assembly lines is of paramount importance. However, the objectives of efficient task and worker assignment and a reduction in ergonomic risks are not usually correlated. Moreover, there is limited research in the existing literature into multi-objective approaches in U-shaped assembly lines. We formulate a U-shaped assembly worker assignment and balancing problem to simultaneously minimize cycle times and ergonomic risks. In addition, and due to its simplicity and successful results in flow shop scheduling problems, a Restarted Iterated Pareto Greedy algorithm is designed to optimize both objectives. In this algorithm, a problem-specific heuristic-based initialization is extended to improve the initial solution. Two precedence-based greedy and local search phases are developed to exploit the space around the current solution. Finally, a restart mechanism is proposed to help the algorithm escape from local optima. Comprehensive computational results, supported by detailed statistical analyses, suggest that the proposed multi-objective algorithm outperforms existing methods on a large number of benchmark instances. (C) 2020 Elsevier Ltd. All rights reserved.
机译:工人仍在制造业的大部分运营。审议工人的转让和减少U形装配线中的人体工程学风险是至关重要的。然而,有效的任务和工人分配的目标和符合人体工程学风险的减少通常不会相关。此外,在U形装配线中的多目标方法中存在有限的研究。我们制定U形装配工人分配和平衡问题,以同时最小化循环时间和符合人体工程学风险。此外,由于其简单性和成功的流水店调度问题,重启迭代帕累托贪婪算法旨在优化两个目标。在该算法中,扩展了特定于问题的启发式的初始化以改善初始解决方案。开发了两个基于优先级的贪婪和本地搜索阶段以利用当前解决方案周围的空间。最后,提出了一种重启机制来帮助算法从本地OptimA转发。通过详细的统计分析支持的全面计算结果表明,所提出的多目标算法优于大量基准实例的现有方法。 (c)2020 elestvier有限公司保留所有权利。

著录项

  • 来源
    《Computers & operations research》 |2020年第6期|104905.1-104905.15|共15页
  • 作者单位

    Wuhan Univ Sci & Technol Key Lab Met Equipment & Control Technol Minist Educ Wuhan Peoples R China|Wuhan Univ Sci & Technol Hubei Key Lab Mech Transmiss & Mfg Engn Wuhan Peoples R China;

    Wuhan Univ Sci & Technol Key Lab Met Equipment & Control Technol Minist Educ Wuhan Peoples R China|Wuhan Univ Sci & Technol Hubei Key Lab Mech Transmiss & Mfg Engn Wuhan Peoples R China;

    Univ Politecn Valencia Inst Tecnol Informat Grp Sistemas Optimizat Aplicada Ciudad Politecn Innovac Edificio 8G Acc B Valencia 46022 Spain;

    Wuhan Univ Sci & Technol Key Lab Met Equipment & Control Technol Minist Educ Wuhan Peoples R China|Wuhan Univ Sci & Technol Hubei Key Lab Mech Transmiss & Mfg Engn Wuhan Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    U-shaped assembly line; Worker assignment; Ergonomic risks; Multi-objectives;

    机译:U形装配线;工人分配;人体工学风险;多目标;