首页> 外文期刊>Computers & Industrial Engineering >A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstations
【24h】

A new mixed-integer linear programming formulation and particle swarm optimization based hybrid heuristic for the problem of resource investment and balancing of the assembly line with multi-manned workstations

机译:一种新的混合整数线性规划公式和基于粒子群算法的混合启发式算法,解决了多人工作站的资源投入和装配线平衡问题

获取原文
获取原文并翻译 | 示例
           

摘要

Resource investment and balancing problem of an assembly line with parallel multi-manned workstations can be defined as the assignment of tasks to reduce the cost of the line, which includes the cost of opened workstations and required renewable resources. Although mentioned problem has been commonly occurred in industrial environment that produce large scale products in high volumes, there have been restricted number of studies in the literature about this field. This article proposes a new mixed-integer linear programming approach that can be used in solving small size instances of the problem. In addition, a new hybrid method has been developed to solve larger scale instances by combining particle swarm optimization algorithm with a special constructive heuristic. In the constructive heuristic, serial schedule generation scheme widely used in solving resource constrained project scheduling problems has been adapted to resource investment problem with some modifications. Proposed metaheuristic has been compared against a tabu search and cuckoo search algorithm taken from the assembly line balancing literature. Many precedence diagrams commonly used in solving various assembly line balancing problems in the literature, have been used to generate test instances for the considered problem type. After solving these test instances using each solution methods, it has been observed that the proposed hybrid metaheuristic yielded the solutions, which have acceptable deviations from the lower bounds.
机译:具有并行多人工作站的装配线的资源投资和平衡问题可以定义为任务的分配,以减少生产线的成本,其中包括开放式工作站的成本和所需的可再生资源。尽管提到的问题已经在工业环境中普遍发生,该工业环境大量生产大规模产品,但是关于该领域的文献研究数量有限。本文提出了一种新的混合整数线性规划方法,可用于解决问题的小实例。此外,还开发了一种新的混合方法,通过结合粒子群优化算法和特殊的构造启发式算法来解决大规模实例。在建设性的启发式,串行进度表生成方案中,已广泛应用来解决资源受限的项目进度问题,并进行了一些修改,使其适应于资源投资问题。已将拟议的启发式算法与取自流水线平衡文献的禁忌搜索和布谷鸟搜索算法进行了比较。在文献中通常用于解决各种装配线平衡问题的许多优先级图已用于生成所考虑问题类型的测试实例。在使用每种求解方法求解这些测试实例之后,已经观察到,所提出的混合元启发式产生了求解,这些求解与下限具有可接受的偏差。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号