...
首页> 外文期刊>Computers & Industrial Engineering >Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method
【24h】

Applying fuzzy multi-objective linear programming to project management decisions with the interactive two-phase method

机译:交互式两阶段方法将模糊多目标线性规划应用于项目管理决策

获取原文
获取原文并翻译 | 示例
           

摘要

The aim of this paper is to develop an interactive two-phase method that can help the Project Manager (PM) with solving the fuzzy multi-objective decision problems. Therefore, in this paper, we first revisit the related papers and focus on how to develop an interactive two-phase method. Next, we establish to consider the imprecise nature of the data by fulfilling the possibilistic programming model, and we also assume that each objective work has a fuzzy goal. Finally, for reaching our objective, the detailed numerical example is presented to illustrate the feasibility of applying the proposed approach to PM decision problems at the end of this paper. Results show that our model can be applied as an effective tool. Furthermore, we believe that this approach can be applied to solve other multi-objective decision making problems.
机译:本文的目的是开发一种交互式的两阶段方法,该方法可以帮助项目经理(PM)解决模糊的多目标决策问题。因此,在本文中,我们首先回顾相关论文,并着重研究如何开发交互式两阶段方法。接下来,我们通过满足可能的编程模型来考虑数据的不精确性,并假设每个目标工作都有一个模糊的目标。最后,为达到我们的目标,在本文结尾处给出了详细的数值示例,以说明将所提出的方法应用于PM决策问题的可行性。结果表明我们的模型可以作为一种有效的工具。此外,我们认为该方法可用于解决其他多目标决策问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号