Ground improvement by compaction grouting in IHC5 and IHC7 dolomitic conditions

机译:在IHC5和IHC7白云岩条件下通过压实灌浆进行地面改良

获取原文
获取原文并翻译 | 示例
           

摘要

Despite the greatly expanded scope of work, largely brought about by the need to support the warehouse surface bed in addition to the key foundations - an item which was essentially not fully budgeted for - the ground improvement designers were constrained to do whatever possible to protect the budget against significant cost overruns. As the geotechnical specialist was appointed on a design-as-you-construct basis, an iterative grouting methodology was adopted, comprising initially broad concentric circles of progressively concentrated grouting, rather than a simpler sequential operation from one side of the site to the other, drilling all possible nodes in the process.
机译:尽管工作范围大大扩展,但主要是由于除了关键基础以外还需要支撑仓库地面床-这基本上是没有充分预算的项目-地面改善设计人员被约束尽一切可能来保护仓库。预算以应对重大成本超支。由于岩土工程专家是按设计时的基础任命的,因此采用了一种迭代灌浆方法,该方法包括最初广泛的同心圆逐步集中灌浆,而不是从站点的一侧到另一侧进行更简单的顺序操作,在此过程中钻取所有可能的节点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号