首页> 外文期刊>Civil Engineering and Environmental Systems >A fuzzy logic approach to model delays in construction projects using translational models
【24h】

A fuzzy logic approach to model delays in construction projects using translational models

机译:用平移模型的模糊逻辑方法对建设项目的延误进行建模

获取原文
获取原文并翻译 | 示例
           

摘要

The likelihood of a project delay is affected by different factors; thus, there is a pressing need to develop a method that estimates the likelihood of such a delay. In this paper, analysis of potential occurrences of delays, which are classified into procedural, enabling, and triggering causes, is performed using the fuzzy fault-tree analysis method. Subjective judgment expresses causes of delay and their respective degree of effectiveness which are analysed in this study. The fuzzy triangular model and translational models are employed in this study. The severity of the likelihood of the project delay is the result of this analysis. A model was developed to assess the likelihood of the project delay. Evaluation of the model was performed for applicability and adequacy of the model. On average, evaluation performed by independent construction engineers and fuzzy logic experts produced satisfactory results.
机译:项目延迟的可能性受不同因素的影响;因此,迫切需要开发一种估计这种延迟的可能性的方法。在本文中,使用模糊故障树分析方法对潜在的延迟事件进行了分析,这些延迟事件分为程序性,启用性和触发性原因。主观判断表示延迟的原因及其各自的有效性程度,本研究对此进行了分析。本研究采用模糊三角模型和平移模型。项目延迟可能性的严重性是该分析的结果。开发了一个模型来评估项目延迟的可能性。针对模型的适用性和适当性进行了模型评估。平均而言,由独立建筑工程师和模糊逻辑专家进行的评估得出令人满意的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号