首页> 外文期刊>ZKG International >Plant Upgrade In Saudi Arabia
【24h】

Plant Upgrade In Saudi Arabia

机译:沙特阿拉伯工厂升级

获取原文
获取原文并翻译 | 示例
           

摘要

ABB Switzerland Ltd announced that it has received an order worth million 6.47 million $ from Eastern Province Cement Company/Saudi Arabia, for the revamp of two raw mills and four cement mills. EPCCs factory lies about 165 km north of Dammam, in Al Khursaniya. In total ABB will deliver six water-cooled cycloconverters including the new control and regulation system AC800PEC. Two new water-cooled cycloconverters with a power of 5900kW each will be implemented for the upgrade of the raw mills #1 and #2. An additional four water-cooled cycloconverters with a power of 5250kW each, will be delivered for the upgrade of the cement mills #1, #2, #3 and #4. Installation and start-up of the system will take place in the fourth quarter of 2010.
机译:瑞士ABB公司宣布,它已经从东方省水泥公司/沙特阿拉伯获得了价值647万美元的订单,用于翻新两个原厂和四个水泥厂。 EPCC的工厂位于Al Khursaniya达曼以北约165公里处。 ABB将总共提供六台水冷式循环转换器,包括新的控制和调节系统AC800PEC。将实施两台功率分别为5900kW的新型水冷式循环转换器,以对#1和#2原始磨机进行升级。另外还将交付四台水冷式循环变流器,每台功率为5250kW,用于1号,2号,3号和4号水泥厂的升级。该系统的安装和启动将在2010年第四季度进行。

著录项

  • 来源
    《ZKG International》 |2009年第2期|7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号