...
首页> 外文期刊>Canal boat >TOW PATH TELEGRAPH
【24h】

TOW PATH TELEGRAPH

机译:牵引路径电报

获取原文
获取原文并翻译 | 示例
           

摘要

As the closures resulting from the winter storms come to an end (with the Anderton and Bunbury stoppages lifted in time for the late spring holiday, and just the Aire & Calder breach still to repair - see page 7) it's now the turn of hot summer weather to impact the canals. In addition to the water supply issues listed on this page, the Gloucester & Sharpness Canal has seen swingbridges taken out of use during the hottest part of the day from 1pm to prevent themjamming due to heat expansion. The Canal & River Trust said it planned remedial works to reduce the frequency of these closures.
机译:由于冬季风暴引起的封闭件结束(随着春季假期的时间升级的Anderton和Bunbury停工,并且只需修复Aire&Calder Breach即可 - 请参阅第7页)现在轮到炎热的夏季 天气影响运河。 除了本页上市的供水问题外,格洛斯特和锐利运河还看到了在当天最热的部分中取出的秋千桥,从下午1点开始,防止由于热膨胀而导致的主机。 运河和河流信托表示,它计划补救措施,以减少这些封闭件的频率。

著录项

  • 来源
    《Canal boat》 |2021年第8期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号