首页> 外文期刊>Bulletin >Polyurethane Grout Seals Rye Patch Well
【24h】

Polyurethane Grout Seals Rye Patch Well

机译:聚氨酯灌浆密封黑麦修补井

获取原文
获取原文并翻译 | 示例
           

摘要

With funding provided by a U.S. Department of Energy (DOE) cooperative agreement under its GeoPowering the West Initiative, polyurethane grouting has been successfully applied to a lost circulation zone in a geothermal well at Rye Patch, NV. Previously, this zone had resulted in the temporary abandonment of the well after conventional cement plugs had been unsuccessful. The techniques applied to grouting with polyurethane were adapted from civil engineering work, where polyurethane is becoming the grout of choice for sealing boreholes with large voids and high cross flows.
机译:借助美国能源部(DOE)合作协议提供的资金,根据其GeoPowering the Western Initiative,聚氨酯灌浆已成功应用于内华达州Rye Patch地热井的失水区。以前,此区域导致常规水泥塞失败后暂时放弃该井。应用于聚氨酯灌浆的技术是从土木工程中改编而来的,在该技术中,聚氨酯已成为密封具有大空隙和高横流的钻孔的首选灌浆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号